Continuity mistake: The Apes cross the timber-pile beaver dam en route to the hydro-station. On their approach, the upstream canyon is shown to have a low water level. As they cross, the water is spilling through that dam.
tedloveslisa
11th Jul 2016
Dawn of the Planet of the Apes (2014)
Upvote valid corrections to help move entries into the corrections section.
Suggested correction: Water is flowing away from the dam, so that is the exit side and the level would be dictated by the flow through and over the dam.
10th Sep 2015
Dawn of the Planet of the Apes (2014)
Continuity mistake: At the Dam Hydro Plant Caesar throws Koba on his back and pummels him. Then they roll once to the right, which now puts Koba on top of Caesar. Yet a quick-cut to their faces shows they kept Caesar on top, still pummeling Koba.
Upvote valid corrections to help move entries into the corrections section.
Suggested correction: It's Koba on top of Caesar in the first part of the fight. Caesar gets the advantage after the roll to the right.